13 Northern Area Western Conference “Gateway to the Oil Sands”, Edmonton, Alberta, Canada, Feb. 11-14 2008. 5. B. Fang, E.-H. Han, J. Wang, W. Ke, “Mechanical and Environmental Influences on Stress Corrosion Cracking of an X-70 Pipeline Steel in Dilute Near-Neutral pH Solutions”, Corrosion 63(2007), 419-432. 6. B. Fang, E-H Han, J.Q. Wang, W. Ke, “Influence of Strain Rate on Near-Neutral pH Environmentally Assisted Cracking of Pipeline Steels”, Acta Metallurgica Sinica, 41 (2005), 1174-1182. 7. B. Fang, E. H. Han, J.Q. Wang, W. Ke, “Stress Corrosion Cracking of X-70 Pipeline Steel in Near-Neutral pH Solution Subjected to Constant Load and Cyclic Load Testing”, Corrosion Engineering, Science and Technology, 42 (2), 123-129 (2007). 8. Y.Z. Wang, R.W. Revie, M.R. Shehata, R.N. Parkins, and K. Krist., “Initiation of Environment Induced Cracking in Pipeline Steel: Microstructural Correlations”, in Proceedings of International Pipeline Conference/1998, Vol. 1, Calgary, Canada, ASTM 1998, pp.529-542. 9. M. Elboujdaini, Y.Z. Wang, and R.W. Revie, “Initiation of Stress Corrosion Cracking on X-65 Linepipe Steels in Near-Neutral pH Environment”, in Proceedings of International Pipeline Conference/2000, Vol.2, Calgary, Canada, ASTM, 2000, pp.967-978. 10. M. Elboujdaini, Y.Z. Wang, R.W. Revie, R.N. Parkins, and M.T. Shehata, “Stress Corrosion Crack Initiation Processes: Pitting and Microcrack Coalescence”, Corrosion/2000, (Houston, TX: NACE International), 2000, Paper No.00379. 11. Y.Z. Wang, R.W. Revie, R.N. Parkins, “Mechanistic aspects of stress corrosion crack initiation and early propagation”, Corrosion/99, (Houston, TX: NACE International), 1999, Paper No.143. 12. G. Van Boven, W. Chen, R. Rogge and R. L. Sutherby, “The Effect of Residual Stress on Pitting and Stress Corrosion Cracking of High Pressure Natural Gas Pipelines”, Acta mater., 55, pp. 29-43 (2007). 13. S. H. Wang, W. Chen, T. Jack, F. King, R. R. Fessler, and K. Krist, “Role of Prior Cyclic Loading in the Initiation of Stress-Corrosion Cracks in Pipeline Steels Exposed to Near-Neutral pH Environment”, in 2000 IPC, p.1005-1009. 14. R. Chu, W. Chen, S. H. Wang, F. King, and R. R. Fessler, “Microstructure Dependence of Stress Corrosion Cracking Initiation in X-65 Pipeline Steel Exposed to a Near-Neutral pH Soil Environment”, Corrosion, 60, p.275-283. 15. B. Fang, R. Eadie, M. Elboujdaini, and W. Chen, , “Passivation/Immersion Method to Grow Pits in Pipeline Steel and a Study of Pit Nucleation and Growth Resulting from the Method”, Corrosion Engineering, Science and Technology, 44(1), p.32-42 (2009). 16. W. Chen, F. King, and E. Vokes, Characteristics of Near-Neutral pH Stress Corrosion Cracks in an X-65 Pipeline, Corrosion, 58, pp. 267-275 (2002). 17. W. Bouaeshi, S. Ironside, and R. Eadie, “Research and Cracking Implications from an Assessment of Two Variants of Near-Neutral pH Crack Colonies in Liquid Pipelines”, Corrosion, 63(7), pp 648-660 (2007) 18. B. Fang, R. Eadie, M. Elboujdaini, W. Chen, and E-H Han, “The Effect of Microstructure on Pit-ToCrack Transition and Crack Growth in an X-52 Pipeline Steel in Near-Neutral pH Environment”, International Pipeline Conference, IPC 2008-64112, Calgary, Alberta, Canada, Sep. 29-Oct. 3, 2008. 19. B. Fang, R.L. Eadie, M. Elboujdaini, and W. Chen, “Pit-To-Crack Transition in an X-52 Pipeline Steel in Near-Neutral pH Environment: I. Formation of Blunt Cracks from Pits under Cyclic Loading”, Corrosion Engineering, Science and Technology, in print. 20. B. Fang, R.L. Eadie, M. Elboujdaini, and W. Chen, “Transition from Pits to Cracks in Pipeline Steel in Near-Neutral pH Solution”, Paper No. ICF2009-290, 12th International Conference on Fracture, July 1217, 2009, Ottawa, Ontario, Canada.
RkJQdWJsaXNoZXIy MjM0NDE=